Rooftop solar PV for facilities in Thailand is available today. Ground-mounted, floating and carport solar are in development and will be available soon, with wider regional coverage to follow.
We'll personalize your solar report and follow up with you.
Not sure? Leave blank. This only decides which guidance we suggest to you; it does not change your results.
O&M is counted automatically when the O&M package below is Basic Cleaning or Full Scope.
Estimates are calibrated for Thailand. Other countries can be entered, but the result is indicative only.
We've sent a 6-digit code to . Enter it below to continue — this confirms we can reach you with your solar savings report.
Didn't get it? Check spam, or
🏢
Facility Details
Tell us about your facility type and available space.
Roof area that stays shaded most of the day (for example by a taller building or a water tank). It is left out when counting how many panels fit.
⚡
Electricity Bill & Site Condition
Your monthly bill determines the optimal system size. Enter your average monthly amount in Thai Baht.
Indicates pre-installation civil and electrical works required. Confirmed upon site investigation.
Shade that still falls on the panels you install, for part of the day, from nearby trees, buildings or other obstructions. Roof area that is shaded most of the day belongs in "Shaded roof area" above.
✨
Your Solution Preference
Choose how you'd like to go solar with iDN69.
After the tenor the system is handed to you and savings become 100% of the electricity value. The realism comments (Too Low, Adequate, High and so on) are set for a 20-year tenor. For 15 years each level comes down by 5 points, and for 10 years by 10 points. Indicative only.
For a 0 THB upfront Power Purchase Agreement (PPA), enter your preferred discount rate. We will tell you how realistic it is.
This assessment covers rooftop solar PV. Ground-mounted, floating and carport solar are in development and will be available soon.
Optional. It does not change the figures; it tells you which roof checks matter most (weight, waterproofing, condition).
🔧
Self Management
3% of savings
Client handles all maintenance. Best for PPA customers.
🧹
Basic Cleaning
7% of savings
Periodic panel cleaning and visual inspection.
🛡️
Full Scope
10% of savings
Complete monitoring, cleaning, repairs, and reporting.
Storage and the transformer add cost but no modelled savings. They are shown beside the Solar PV only option so you can see what they add.
📊
Your Solar Savings Estimate
Solar Coverage
0%
Awaiting calculation...
Your submitted details Read-only
These details were submitted with your report and cannot be changed here. To assess another site, use Start Over.
⚙️
System Specifications & Financial Analysis
🧾
Indicative Budget (Excluding VAT)
Planning budget only, based on reference prices. It is not an offer or a quotation and must be confirmed by quotation after a site survey.
🏦
After Tax, NPV and Bankability
⚖️
Solar PV, Storage and MV Options (Excluding VAT)
30-Year Cumulative Savings
Annual Savings by Year
EPC vs PPA: 30-Year Cumulative Comparison
EPC (Brown line): Cumulative net position after upfront system cost. Crosses zero at payback point, then compounds into high 30-year value. PPA (Green line): Cumulative savings with zero upfront cost. Starts at ฿0 and grows steadily from Year 1, but lower total due to discount.
EPC — Buy the System
You own the system from day one
PPA — Pay Per Use
Zero Upfront Investment
Initial Investment฿0 — Zero Upfront
Est. Annual Savings Range฿0 – ฿0
30-Year Total Savings฿0
After PPA TenorSystem Transferred to Client
🔧
Equipment considered
Classes shown are indicative; final selection is made at site assessment. Brand names appear in the Equipment Glossary on the Knowledge Hub. They are not an endorsement.
📚
Explore further, free
Disclaimer: This estimate is based on standard assumptions and indicative calculations only. Budget figures exclude VAT. Actual savings may vary based on site-specific factors, weather patterns, equipment efficiency, and system installation conditions. Need a detailed consultation? Connect here!
Conditions to confirm for your site
These items need a site survey, an engineer or an approval. This estimate cannot decide them.
Ready to Start Saving?
Our team will conduct a detailed site assessment and provide a precise proposal for your facility.
Browse iDN69's supply chain capability with reference equipment datasheets.
Note: These are reference equipment PDFs only. Actual system design, equipment selection, and final specifications depend on site assessment, capacity requirements, and project scope. All equipment is indicative and subject to availability and project confirmation by DIA Co., Ltd. (PPA signatory) and WSI DN69 (EPC executor).
☀️ Solar Panels
Manufacturers: AIKO, Canadian Solar, JA Solar, Huawei (reference only)
Disclaimer: All equipment specifications, pricing, and availability are indicative only and subject to change. Final equipment selection, capacity confirmation, and site-specific design will be determined during project development and site investigation. Consult with DN69 / WSI DN69 team for your specific requirements.
Free to explore. Nothing to pay.
This exploration is a DN69-IP (Intellectual Philanthropy) initiative and is completely free of charge. It gives you the answers you need to judge with clarity and act precisely to suit your own needs. Results are indicative; need more detail? Click here to email us.
iDN69 Platform — Four Pillars, One Solution
EPC
End-to-end engineering, procurement, and installation — from system design through commissioning.
O&M
Ongoing operations and maintenance to keep your system performing at its rated output for the long term.
PPA
Power purchase agreement structuring for OPEX-based solar — zero capex ownership.
Education & Consulting
A free Knowledge Hub, plain-language previews of iDN69 standard documents, and tailored consulting for your project.
Hosted by DN69-IP. Each member is shown with what it brings to the network.
PPA Project Developer
EPC and O&M
EPC and O&M
Premium Equipment Supply Chain
Legal and Contractual Guidelines; PPA Project Viability Assessment
Consulting
PPA Project Developer
EPC and O&M
EPC and O&M
Premium Equipment Supply Chain
Legal and Contractual Guidelines; PPA Project Viability Assessment
Consulting
Join IDN69
Joining is free. Tell us who you are.
Joining does not list you in the partner strip. Members shown there are added by DN69 after its own review.
Thank you. We have your request and have emailed you a confirmation; we will be in touch. Questions? works@dn69.org
📋
Please review your details
Check everything below. After you confirm, your results are calculated and shown on screen, and your details are sent to the DN69 team. You can then choose to email or print your own copy.