iDN69 solar PV decision-making tool

FreeNo obligation
1Business engagement models
2Different user categories

Same tool, tailored to who is asking. Tap any box to see your route.

Rooftop solar PV for facilities in Thailand is available today. Ground-mounted, floating and carport solar are in development and will be available soon, with wider regional coverage to follow.

⚡ Location-Specific Yield (PVsyst-based)
🇹🇭 Thailand-Wide Coverage
📊 30-Year Projections
Go straight to the full assessment
Free first estimate

The basic estimate most free tools give

Drag to your monthly bill and choose your province. The figures move as you do.

฿ 150,000

Example figures. Move the slider or type your bill to see yours.

Saving on electricity in year 1–
–System Size
–Payback after tax
–Net gain over 30 years, after tax

Your full report also shows

  • Owner returns
  • EPC vs PPA comparison
  • Lender view
  • Storage and MV options
  • 30-year charts and table
  • Carbon impact

Not enough for precise decision-making

To make the right decision, you need the detailed assessment.

Basic figures: factory-type building, unshaded roof, cash purchase, Full Scope package.

Free. Your answers are carried over; we verify your email once.

1
About You
2
Facility & Bill
3
Your Preference
👤
Tell Us About Yourself
We'll personalize your solar report and follow up with you.
Estimates are calibrated for Thailand. Other countries can be entered, but the result is indicative only.
🏢
Facility Details
Tell us about your facility type and available space.
Roof area that stays shaded most of the day (for example by a taller building or a water tank). It is left out when counting how many panels fit.
⚡
Electricity Bill & Site Condition
Your monthly bill determines the optimal system size. Enter your average monthly amount in Thai Baht.
Indicates pre-installation civil and electrical works required. Confirmed upon site investigation.
Shade that still falls on the panels you install, for part of the day, from nearby trees, buildings or other obstructions. Roof area that is shaded most of the day belongs in "Shaded roof area" above.
✨
Your Solution Preference
Choose how you'd like to go solar with iDN69.
After the tenor the system is handed to you and savings become 100% of the electricity value. The realism comments (Too Low, Adequate, High and so on) are set for a 20-year tenor. For 15 years each level comes down by 5 points, and for 10 years by 10 points. Indicative only.
For a 0 THB upfront Power Purchase Agreement (PPA), enter your preferred discount rate. We will tell you how realistic it is.
This assessment covers rooftop solar PV. Ground-mounted, floating and carport solar are in development and will be available soon.
Optional. It does not change the figures; it tells you which roof checks matter most (weight, waterproofing, condition).
🔧
Self Management
3% of savings
Client handles all maintenance. Best for PPA customers.
🧹
Basic Cleaning
7% of savings
Periodic panel cleaning and visual inspection.
🛡️
Full Scope
10% of savings
Complete monitoring, cleaning, repairs, and reporting.
Storage and the transformer add cost but no modelled savings. They are shown beside the Solar PV only option so you can see what they add.
📊
Your Solar Savings Estimate

Solar Coverage

0%
Awaiting calculation...

Your submitted details Read-only
These details were submitted with your report and cannot be changed here. To assess another site, use Start Over.
What should your report include?

System size, savings and coverage are always included. We pre-select what usually matters for your role. Tick anything else you want and untick what you do not need; only ticked sections appear on the results page and in the PDF.

⚙️
System Specifications & Financial Analysis
🧾
Indicative Budget (Excluding VAT)
Planning budget only, based on reference prices. It is not an offer or a quotation and must be confirmed by quotation after a site survey.
🏦
After Tax, NPV and Bankability
⚖️
Solar PV, Storage and MV Options (Excluding VAT)

30-Year Cumulative Savings

Annual Savings by Year

EPC — Buy the System
You own the system from day one
PPA — Pay Per Use
Zero Upfront Investment
Initial Investment ฿0 — Zero Upfront
Est. Annual Savings Range ฿0 – ฿0
30-Year Total Savings ฿0
After PPA Tenor System Transferred to Client
🔧
Equipment considered
Classes shown are indicative; final selection is made at site assessment. Brand names appear in the Equipment Glossary on the Knowledge Hub. They are not an endorsement.
📚
Explore further, free
Disclaimer: This estimate is based on standard assumptions and indicative calculations only. Budget figures exclude VAT. Actual savings may vary based on site-specific factors, weather patterns, equipment efficiency, and system installation conditions. Need a detailed consultation? Connect here!

Conditions to confirm for your site

These items need a site survey, an engineer or an approval. This estimate cannot decide them.

    Ready to Start Saving?

    Our team will conduct a detailed site assessment and provide a precise proposal for your facility.

    Free to explore. Nothing to pay.

    This exploration is a DN69-IP (Intellectual Philanthropy) initiative and is completely free of charge. It gives you the answers you need to judge with clarity and act precisely to suit your own needs. Results are indicative; need more detail? Click here to email us.

    iDN69 Platform — Four Pillars, One Solution

    EPC

    End-to-end engineering, procurement, and installation — from system design through commissioning.

    O&M

    Ongoing operations and maintenance to keep your system performing at its rated output for the long term.

    PPA

    Power purchase agreement structuring for OPEX-based solar — zero capex ownership.

    Education & Consulting

    A free Knowledge Hub, plain-language previews of iDN69 standard documents, and tailored consulting for your project.

    Open the Knowledge Hub →

    Members already onboard the Platform

    Hosted by DN69-IP. Each member is shown with what it brings to the network.

    • DIA Co., Ltd.PPA Project Developer
    • WSI DN69EPC and O&M
    • Solar GoodyEPC and O&M
    • IdeafieldPremium Equipment Supply Chain
    • BD Touch Co., Ltd.Legal and Contractual Guidelines; PPA Project Viability Assessment
    • DN69-RISEConsulting